Available options
We identify suitable lower-GWP equipment within the fleet for the required duty.

Lower-GWP chiller hire
Modern temporary chiller options selected to reduce refrigerant impact while meeting the operating duty of the site.
The requirement comes first
Global Warming Potential is one part of chiller selection. We balance refrigerant choice with duty, efficiency, temperature range, safety and equipment availability so the temporary system works in practice.
Engineered temporary cooling
We identify suitable lower-GWP equipment within the fleet for the required duty.
Better matching can reduce unnecessary energy use as well as equipment footprint.
Refrigerant characteristics are considered alongside the location and operating conditions.
Service and technical support remain part of the rental package.
From requirement to running
Confirm duty, site constraints and environmental requirements.
Review suitable equipment and refrigerant options.
Size the full temporary system around the real load.
Maintain performance through the hire.
Where it works
Before we specify equipment
The right answer comes from the operating detail. These are the points our engineers will work through with your team.
Refrigerants differ in their climate impact, but selection must still meet safety and duty requirements.
A well-sized system operating close to its useful range can cut wasted power.
Charge, equipment design and site conditions affect which options are suitable.
We confirm the fleet options available for the programme and capacity required.
Complete hire package
One accountable team can coordinate the equipment around your duty, site and programme.
Frequently asked questions
Global Warming Potential compares the climate impact of a refrigerant if it is released. A lower number means a lower relative impact.
Availability depends on capacity, temperature and site conditions. We will set out the suitable options when sizing the package.
Hire periods can cover a short breakdown, a planned maintenance window, seasonal demand or a longer project. We shape the agreement around the programme.
Gradwell Chiller Hire provides technical support throughout the hire. For urgent requirements, the response team is available 24 hours a day.
Specialist chiller hire
Start with the requirement
Share your required temperatures, process load, site and dates. Our specialists will recommend a practical temporary system.
Request a quote